IDS Auto IDS Auto

Trailer Dump Semi Dump Semi Trailer Truck High Quality Coal or Grain Rear Hydraulic Trailer

Customization: Available
Material: Steel
Color: Optional

Product Description

Basic Info.
Model NO.
Tipper Trailer
Axle
13t Fuwa Brand / BPW
Suspension
Springs / Air Bag
Kingpin
50mm / 90mm
Payload
30-100 Tons
Volume
20~40m3
Certification
ISO9001, CCC
Condition
New
Product Description
The 3 axle Side tipper trailer is suitable for the transportation of bulk cargo such as coal, ore, building materials, etc. Our trailer adopts computer-aided design software to optimize the design, according to the quality requirements of the vehicle, the frame finite element analysis, scientific design, reasonable load, the same load, effectively reduce the weight of the product, and can effectively improve the loading and unloading and transportation efficiency of the dump trailer.
Tipper semi trailer as popular trailer for sand stone transport. We can design different bottom and side wall thickness based on your transported goods. The capacity can be customized (20 Cubic Meters, 30 Cubic Meters, etc.). We offer both U Shape and Square Shape designs. To handle rough road conditions, we utilize thickened Leaf Springs and Mechanical Suspensions to ensure safety during transport.
Product Parameters
DIMENSIONS & PAYLOAD
Tare weight10000kg Payload60000kg
Overall Length8700mm Overall Width/Height2500mm / 3600mm
SPECIFICATIONS
Chassis High tensile Q345 I beam; Top flange 18mm, Middle 10mm, Bottom 20mm.
Axles3 Axles (13T Capacity) Tires11.00R20, 12.00R20, 12R22.5 Optional
Landing GearJOST brand two-speed CylinderHYVA Hydraulic System
BrakingWABCO RE6 relay valve PaintingSand blasting + Anti-corrosive prime + Final paint
Packaging & Shipping
After Sales Service & Quality
  • 🔹 24 hours corresponding to your feedback.
  • 🔹 Free spare parts during the warranty period.
  • 🔹 Full technical and maintenance support.
  • 🔹 Accessories delivered within 3 days.
  • 🔹 All spare parts tested before assembly.
  • 🔹 Automatic and manual high-quality welding.
FAQ
What are your terms of packing?
Generally, our goods utilize nude packing. We provide product and package photos before delivery.
What are your payment terms?
T/T 30% as deposit, and 70% balance payment before delivery.
What is the expected delivery time?
Generally, it takes 15 to 30 working days after receiving your deposit, depending on the order quantity.
Do you test all goods before delivery?
Yes, we conduct 100% testing on all products before they are dispatched.
What shapes of tipper trailers are available?
We provide two main types: U-Shape and Square Shape, which can be selected based on your transport needs.
How do you ensure trailer durability for rough roads?
We design our trailers with thickened Leaf Springs and Mechanical Suspensions specifically for challenging terrain conditions.

Related Products